Getting closer

Just about all (and there has been a lot) of the inside joinery is finished, and the preparation of the ground around the house for the paved areas is complete. Plumbing, electrics and decoration work remain, but we definitely have a habitable house now.   We hope that in another two weeks all will be ready for us to have our furniture and other belongings moved in.

foundation stone is in place under the walkway and down the side of the house

the stairway has its oak windowsill and awaits decoration and the glass panels of the balustrade

the bedhead is almost finished

with bedside lights still to be fitted


the stone spreading continues

to the north we are ready for fencing and paving


but at the front much remains to be done

the joinery work in the utility room is done

and we have a shelved airing cupboard

Rob will fit the led strip lighting at the edge of the staircase

the maize is just showing in the field - in a few months it will be 7 or 8 feet high

the spoil will be removed and we will have storage and a greenhouse in this strip

and one day we will have a tidy front aspect, but not yet

 