More flooring, less scaffolding
In the last week steady progress has been made with floor surfaces, we have had a date ten days away confirmed for the delivery of our kitchen, and more of the scaffolding has been taken away, progressively revealing what the house will eventually look like, even though not all of the cladding has been fitted. here's the view from the kitchen through to the utility room (the end of the conduit and the sponge won't be there eventually - and the island will from the kitchen through to the dining area from the kitchen across the hall to the sitting room from the hall through to the front study and from the study back to the hall Upstairs Ian the joiner started mid-week to glue the engineered oak flooring in place. Like the cladding, it's not a quick job as everything has to be aligned, and the boards have to be clamped together and weighted down until the adhesive has gone off. the job started with long lengths laid along the main landing (the board on the left is a referenc...