More flooring, less scaffolding
In the last week steady progress has been made with floor surfaces, we have had a date ten days away confirmed for the delivery of our kitchen, and more of the scaffolding has been taken away, progressively revealing what the house will eventually look like, even though not all of the cladding has been fitted.
the job started with long lengths laid along the main landing (the board on the left is a reference straightedge)
from bedroom 2 .....
past Elizabeth's study .....
to bedroom 4
Incidentally, our sprinkler system (detailed in an earlier post) does not mean that we shall be without smoke alarms. Thankfully they will be mains-wired but they will occasionally need to have their back-up batteries changed. Here's one for reference:
When we visited with Chris, Katie and their children on Saturday (all of whom managed the ladder very well in order to explore upstairs) we realised that some scaffolding had been removed and a clearer view was emerging of the front of the house.
here's a spooky image showing the photographer, taken from the new strip of our land which will be fenced off from the field
By Sunday the front of the house was clear:
we are looking forward very much to seeing the cladding go on the entrance porch
When we visited this afternoon the scaffolders were there again, stripping out more of the boards and poles.
for the first time, we have a scaffolding-free view from our bedroom, today a view of misty drizzle
We love the various flooring. Home is looking great.
ReplyDeleteThank you - the tiled floors have now disappeared under a protective paper covering while the rest of the fit-out carries on. More and more of the upstairs wooden floors happening every day.
ReplyDelete