The pace has slowed

Well, we are still waiting for our windows, and haven't heard from Pat what sort of delay we are facing this time. The last ten days have been pretty quiet at the house, with just a day's work by Sean yesterday preparing to install shower trays, and the garage and walkway roofs being felted and battened today. When the windows do come, the transformation will be immense, but at present you have to look closely to see what's changing.

a few days ago, this shows the finished joinery on the garage/workshop roof

we are looking forward to enjoying the view from the dining area when the fence/hedge is tidied and the scaffolding disappears

today, the felted and battened roof of the garage/workshop creates a visual link between the roof of our neighbours' outbuilding and our main roof

on the other side .....

..... and from bedroom 4 (I'm assuming the handtools left on the battens mean work will resume soon)

the walkway roof links to the garage/workshop past the bay window of bedroom 3

Sean has cut out a section of the concrete ground floor in the shower room to make the shower tray connection. I'm assuming the drainage pipe was put in place a long time ago when the block and beam floor was laid - great forward planning!

this is the view from the doorway, and there's obviously more work to do, as at present the tray's drainage hole doesn't match the position of the hole in the floor

checking for size in the ensuite of bedroom 1

and in the ensuite of bedroom 2

this was the sky as seen from the front garden late this afternoon

 

Comments

Popular posts from this blog

Eighteen months have passed

Gravel, gates, and a working wood-burning stove

We have boundary walls