First floor joists
The weather is not currently particularly conducive to building progress, being a mixture of heavy showers and cold temperatures, but we dropped in today to find Pat and his joiner fitting the first floor joists. The only likely progress next week will be the addition of scaffolding, as the block-laying team are going to be on holiday. At Pat's suggestion I rang Ian at Hendrewydd Farm to ask his permission for the scaffolders to place some supporting poles over the hedge in the field, and he was ok with that.
We were a little bit surprised that Adrian and the structural engineer hadn't specified the more expensive posi-joists
as we know that they make the running of services through the floor much easier, and save contractors' time. We are going down the old-fashioned route of solid timber. At least Pat hasn't had the task of measuring for posi-joists - he was chuntering again gently today about Adrian's design for 'interest' in wall-lines, which means there is a lot of individual cutting-to-length to be done.
our bedroom floor supports in place
from the north-east corner
joists ready for bedrooms 3 & 4
195mm x 47mm timber joists

Comments