A week of April has passed, and we are not expecting any action on site for another week. The big news is that we are now featuring on the Denbighshire County Council list of upcoming roadworks, with two stretches of road scheduled to be closed either side of Plas Coch Bach corner (named after the house whose owners we bought the plot from) next week. O'Connor Utilities are a large sub-contractor for Scottish Power Networks, who control the electrical supply system in this part of the world. We assume therefore that they have been engaged to do our job, and that SPN have passed on some of their not inconsiderable fee to DCC to cover the costs involved in signposting the diversions.
We very much hope that our immediate neighbours will not be inconvenienced too much. We may need to visit the site with large supplies of flapjack.
We had originally assumed that, in line with the rest of the village, we would be offered an overhead mains electricity supply via a pole to be erected on our plot, but apparently the current policy is to proved underground connections. The nearest available connection, we are told, is 40 metres or so from the plot, appropriately enough by our architect's house. So our supply will follow the route of the yellow line in the drawing below. It's not, as you might think, going to be below a pavement as the roadways here are only a car and a half wide. Hence the need for road closures and diversions.
Wish us luck.
Comments
Post a Comment