The preparation proper begins
November is not normally regarded as the best time of the year to begin groundworks, but our development has been waiting most of this year for the consent for our sewer connection, which had to be in place before our foundations could be built. So 10 November 2020 was the date for the site preparation (removing rubbish and scraping off the topsoil) to begin. Gwyn, who was the JCB driver for the sewer job, returned and neatly scraped and scraped away. The topsoil was gathered at one side and back of the site. Gwyn even kindly replanted in the corner of the site a now leafless acer which we had all admired in its autumn finery three weeks earlier. We visited in the late afternoon. For the first time, the plot no longer looked like the former garden it had been, pond and all.
The second day's work involved more grading and the lorrying away of spoil. Fortunately the ground held up (just) to the weight of the lorry. There's still moisture in the ground after significant rain a couple of weeks ago. However, a strange sight greeted us when we went for a look after lunch. The upturned pond liner sat pretty much in the middle of the plot, and Gwyn showed us that it was covering the access to what appears to have once been the septic tank of the neighbouring house. Alongside it are the remains of an inspection chamber.






Comments
Post a Comment