Mainly roofing details

Today was a beautifully sunny autumn day, and we headed over to Gellifor for a bit of a walk and a look around the house. It's the first time for a while that we've been there out of hours, so a chance to walk the scaffolding and see things close up, now that that the guttering has been added.

the garage/workshop awaits its roof and doors

we shall have something like this view towards the village from bedroom 1

the guttering is now in place, but the downpipes will be added after the rendering and weatherboarding have been added

interesting corner detail, with the lead valley nudged to guide the rain water

looking along one side of bedroom 1.....

....and back along the other side

the roof vent is for the extractor fan of bedroom 2's ensuite

neat lead details around the chimney....

.....and again

proof that the ridge tiles are mortared in place, though more discreetly than used to be the style

another valley nudge

from the back, down the kitchen side, with Liz standing just outside the line of the canopy linking the side door to the personnel door at the back of the garage/workshop

through the garage/workshop (the blue loo won't always be there)




Comments

  1. That’s what I love about you, your optimism! In relation to the blue loo. Great roof detail.

    ReplyDelete
    Replies
    1. The blue loo sounds quite poetic. Perhaps we should keep it?

      Delete

Post a Comment

Popular posts from this blog

Eighteen months have passed

More trenches - and now they are full

Gravel, gates, and a working wood-burning stove