A wet start to October

The last few days have been pretty horrible with torrential showers and longer periods of rain. We're full of admiration for our block-layers, who have kept going on the garage throughout, and for our electrical team and, today, our joiners who at least had the benefit of working under a roof. We haven't yet had the roof-lights over the dining room and porch fitted, so it's not all dry inside. We're looking to the second week of November (hopefully) for our windows to be fitted. Quite a change now that the garage walls are up and the studwork downstairs is in place.

the plan is that the garage/workshop will 'soften' the front gable - and one day the forecourt will have the hardcore removed

garage walls supporting the lintel and awaiting the mid-wall buttresses

very neat to have had the roof truss fixed in position on the front wall as a guide

very impressed with the neat joinery for our hall cupboard - it will be an interesting plastering challenge

yesterday the drum was catching drips from the roof-light opening, but today it's full and too heavy to move, so there's an innovative water slide in place

the studwork now divides off the kitchen - to the left, the utility/plant room, in the middle a space for a pull-out larder unit, and to the right the back wall of the downstairs shower room

yes, we checked, and this will accommodate a 400mm wide cabinet

there should be plenty of room in the utility plant room, but there are two hot water tanks (one a heat buffer) and lots of clever control systems to accommodate

this will be the downstairs shower room, close to the study/potential downstairs bedroom

more and more cables and back boxes are in place - including the small boxes for a lamps circuit switched from the doorway

no possibility of confusion, obviously

the insulation is in place on the upstairs landing

but upstairs is still accessed by a ladder

the top of the soil stack will vent through the roof above the ensuite in bedroom 2 

and in the neighbouring field, the maize is approaching ripeness

so the house is slipping .......

......away


Comments

Popular posts from this blog

Eighteen months have passed

More trenches - and now they are full

Gravel, gates, and a working wood-burning stove