More roof, and a chimney

There is a lot of work to do on this kind of roof even after the main trusses have been put in place. There are the complications of placing the rafters over the double height entrance area, which will be lit by Velux windows, and a lot of valleys have to be constructed. Ian the joiner has been on site all week (fortified by another batch of brownies today) and the blockwork duo have also been hard at it, building up both skins of the gables and constructing the flue and chimney (which is rather trickily tapered from ground to top).

It's looking more and more like a house.

the view from the road is becoming familiar now, with the front gables fitting in with next door

the left-hand gable encloses a void, but breaks up the mass of the frontage

looking up from the hall past where the staircase will be - the wider gaps will have velux windows

and this will be the velux in bedroom 3

we have a chimney (and a departing Elizabeth)

here's the bottom of the flue in the sitting room

and here's towards the top

the upper opening will have a glass balustrade to the landing

obligatory E picture 

settling in, in the sunshine

and closer

and closest


Comments

Popular posts from this blog

Eighteen months have passed

More trenches - and now they are full

Gravel, gates, and a working wood-burning stove