More joinery and block-laying

We are in the middle of a mini-heatwave here, but work has been continuing at the plot. We missed a daily visit yesterday, but were rewarded this evening with more roof joinery completed, including valleys and finished gables, and completed blockwork on all the gables, together with an extra steel joist installed upstairs on the only solid first floor wall (the remainder will be timber stud walls). The last building control visit for the superstructure is scheduled for Thursday, and on Friday we are hoping to meet the boss of the renewables company which will probably take over the work from South West Heat Pumps, who have gently withdrawn from the job because of the distance (and, we suspect, their workload as the end of RHI approaches early next year). The new company, Bentley Bespoke Renewables, come recommended by SWHP and use 'their' ground source heat pump, made by Clausius.

the gables have sharp lines now

upstairs internal block wall and steel

the rear bedroom 1 gable seen through the dining area 'rooflight'

the rear gable of bedroom 2

the rear gable of bedroom 1

joinery extensions

one of the many valleys which will be lead-clad

gable close-up

just geometry and light

layered timber

inside an insulated gable

to the left, the picture window of bedroom 2

this is a view across the top of the staircase towards bedroom 1

geometry fun 1

geometry fun 2