7 July - finishing the first stage of work on the wall

My third sunny and hot early start this week, and the preparation is now a well oiled machine - wheelbarrows out from behind the bushes; generator from under the tarpaulin; breaker drill, extension cable, spade, yardbrush, gloves, protective glasses and water bottle from the Land Rover, and we're away.

No problems this morning, none of the blocks so big as to need splitting before transportation (unlike Thursday) and less than three hours saw this stage of the work finished. I left some small blocks on the wall as there is some levelling to do before the soldier stones go back.

I met some more neighbours this morning, one of whom encouraged me to talk to the farmer to see if he wanted to sell some of the adjacent field. There would be planning limitations if we did, but it might be nice to have some extra breathing (or chicken) space around the plot.

I went to TP in Denbigh on the way home to arrange a delivery of sand and cement for next Friday as we are having a jobs trip to Emma and Ian's from Sunday to Wednesday and I may be driving for the hospice again on Thursday.

Pictures show the way the visibility for drivers has improved around the bend - or will have when the vegetation is dropped.




Today, as agreed, Andrea Sass started to advertise an open morning for CyMI in a fortnight's time on 21 July, and we started to advertise this via Facebook, with our friends sharing a link. We already have an expression of interest from Manchester - it will be interesting to see what transpires.